Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: inland waters

Applications are open until Wednesday 15 January for the 2020 Waterways Ireland Event Programme, which aims to support events on or along Ireland’s inland waterways throughout the year.

Taking place annually for the past 13 years, the programme has supported competitions, learning experiences and community, historical and educational events for people with and without disabilities across thousands of communities nationwide.

Involving angling, canoeing, rowing, sailing and power sports, arts, history, drama and learning new skills, Waterways Ireland these events have most importantly been about having fun.

Sharon Lavin of Waterways Ireland said: “The new vision for the Event Programme will activate event organisers to consider how they can build in ongoing activity and sustained use of the waterways corridors into their event.

Tourism and participation in recreation has a social and economic impact in waterfront communities, and events are a great way to engage communities with previously under-utilised waterways.”

The application form (with guidance notes) can now be viewed and completed online. Terms and conditions apply. The closing date the receipt of completed applications is Wednesday 15 January.

Published in Inland Waterways

The chief executives of Fáilte Ireland and Waterways Ireland met last week to discuss their new Strategic Partnership Programme to develop tourism along the latter’s network of inland waterways.

The agreement is focused on delivering “a programme of works to improve the quality of the visitor and user experience along Waterways Ireland’s waterways”, the cross-border body said in a statement.

These include the Barrow Navigation, Royal and Grand canals, Shannon-Erne Waterway and Shannon Navigation.

It’s aimed to link these projects with Fáilte Ireland’s regional brands the Wild Atlantic Way, Ireland’s Ancient East, Ireland’s Hidden Heartlands and Dublin.

And the partnership also involved cross-promotion and marketing efforts, such as Waterways Ireland’s Shannon Masterplan to develop sustainable tourism in the Shannon corridor, and future plans to encourage visitors’ engagement with the canals in Dublin city.

“The waterways are a key part of the tourism offering in rural Ireland and the Dublin region,” said Fáilte Ireland chief executive Paul Kelly.

“Unlocking the incredible tourism potential of waterways such as the Shannon River which flows through so many rural communities will mean generating a huge number of opportunities and growth in local economies.”

Waterways Ireland acting CEO John McDonagh added that the Shannon Masterplan in particular “is an excellent first step in our programme and we look forward to a fruitful partnership which benefits the communities and economies across our waterways”.

Published in Inland Waterways

Despite the growing demand for houseboat living in Ireland, there are only 28 residential moorings across the whole of the country, as RTÉ Radio 1’s Morning Ireland reports today (Wednesday 3 July).

Grand Canal Dock alone has a waiting list of some 215 hopefuls for its 20 places, and the programme hears from some of those fortunate enough to have made their home on Ireland’s inland waterways.

Waterways Ireland says it received as many as 10 queries a week from prospective houseboat residents — who will likely be waiting some time as only Grand Canal Dock and Shannon Harbour, with eight moorings, have provision for live-aboard homes.

Others make do with part-time waterways living, using the current 90-day permits to move around the country’s canals and rivers.

But with demand on the increase, it’s a situation that Waterways Ireland acknowledges has to change. RTÉ Radio 1 has more on the report HERE.

Published in Inland Waterways

Waterways Ireland has issued Marine Notices related to a number of events taking place on Ireland’s inland waterways this weekend.

On the Royal Canal, a Junior Canoe Polo Competition will take place at Kilcock Harbour from 10am to 6pm tomorrow, Saturday 22 June.

Passage will be possible between 1pm and 2pm. Masters of other craft are requested to proceed at slow speed and with minimum wash and note any directions issued by the stewards.

On the Shannon-Erne Waterway, masters and owners of vessels are advised that they may experience short-term delays between Lock 1 at Corraquill and Ballyconnell Marina between 1pm and 6.30pm tomorrow due to the waterway’s 25th anniversary event.

Masters are requested to proceed at slow speed and heed any instructions issued by the event marshals.

Elsewhere on the River Shannon, the swimming element of a triathlon event will take place in Tarmonbarry on Sunday 23 June between 9.30am and noon.

Tarmonbarry lock will be closed to traffic during this time, and the N5 Shannon lifting bridge will also be closed, requiring large airdraft vessels to berth north of the bridge for the period.

A children’s swimming event will take place at 6pm on Saturday in Tarmonbarry, but this will not affect vessels in the navigation.

Masters are requested to proceed at slow speed and with minimum wash when approaching this section of the river and heed any instructions issued by the event marshals.

Meanwhile, on Upper Lough Erne, masters and owners of vessels are advised that dredging works are due to commence at Kilmore Quay on Monday 1 July and last for approximately nine weeks.

The map below shows the area to be dredged and the route the vessels will be taking in order to bottom-dump the material.

Marine Notice Upper Lough Erne

Masters of vessel are requested to proceed with additional caution in the vicinity of the dredging operations and dredging vessels.

Waterways Ireland thanks its customers for their co-operation in this and all other matters.

Published in Inland Waterways

Proposals for a new blueway along the River Barrow have been blocked by planners who objected to the scheme for a hard surface along the 115km of towpath.

But as The Irish Times reports, many locals and users of the waterway believe what the Barrow and the communities along its reach really need are better promotion.

Earlier this month, An Bord Pleanála rejected plans long in the offing for the Barrow Blueway, a new cycling and walking path between Lowtown in Co Kildare and St Mullins in Co Carlow.

Hundreds of Barrow locals had their say at public meetings, with campaigners against the path plans — among them broadcaster Olivia O’Leary — citing the existing grassy surface as more than suitable for walkers.

Others saw the blueway as “a fantastic opportunity” to save business such as pubs which have been closing at a rapid rate in rural areas, and raised the question of boggy or overgrown stretches that are a deterrent to visitors.

But others still argue that with proper maintenance and a weight of a promotional campaign behind it, the existing path would prove a major tourism attraction both domestically and abroad.

“I have people coming from the States, Canada, Australia, Europe, UK and they are just flabbergasted at how incredibly gorgeous it is, and they can’t believe there is nobody on it,” said local canoe tour operator Charlie Horan.

Those sentiments are shared by environmental journalist Lenny Antonelli, who tweeted that the Barrow is “already walkable, paddle-able and often cycle-able too.

“The Barrow doesn't need a greenway, but it does need better marketing and promotion, particularly within Ireland, and better facilitates for visitors. Imagine if all its derelict lock cottages became bothies for example?”

The Irish Times has more on the story HERE.

Published in Inland Waterways

The Network of Inland Waterways of Europe (NIWE) has launched its new website to celebrate and promote the many and varied benefits of Europe’s canals, lakes and rivers.

The NIWE, of which Waterways Ireland is a member, has been involved in numerous transnational projects boosting waterways organisations, local communities and businesses, and users alike.

The network’s shared objectives are to:

  • Celebrate and promote the economic, social and environmental benefits of Europe’s inland waterways;
  • Monitor and disseminate information on EU policy development and programmes;
  • Support members’ participation in European initiatives and funding programmes;
  • Promote the exchange of experience and knowledge transfer across the NIWE and among other relevant organisations and potential members;
  • Create stronger engagement with the EU institutions to ensure the potential of European inland waterways is understood and reflected in EU policy and future programme development; and
  • Collaborate with national and international organisations to achieve these stated objectives.

The new website at WaterwaysNetwork.eu is being touted as key tool in realising these objectives, serving as the NIWE’s marketing, project knowledge transfer and promotional platform for the future.

It it hoped it will also assist the network in developing future collaborative opportunities both with both European partners and local, regional and national partners.

Published in Inland Waterways

Waterways Ireland has announced the launch of a walking programme along canal and river routes across Kildare, Carlow and Laois.

The aim of the Waterways For Health programme — in conjunction with Get Ireland Walking, and Local Sports Partnerships from Kildare, Carlow and Laois — is to immerse participants into natural waterway environments with guided support from county walking facilitators from Local Sports Partnerships.

“Waterways Ireland has seen a huge increase in the number of recreational and tourist users on and along all our waterways in recent years,” said Sharon Lavin of Waterways Ireland>

“With the provision of our Blueway and Greenway trails, we have now created even more opportunities for people to try new recreational activities. This also offers greater health and well-being and social opportunities for locals”.

For more information on the new Waterways For Health programme, its partners and their services, see GetIrelandWalking.ie and www.SportIreland.ie (to find your Local Sports Partnership).

Published in Inland Waterways

#InlandWaters - Seán Kyne, Minister of State at the Department of Culture, Heritage and the Gaeltacht, has announced a €3.2 million investment by Waterways Ireland infrastructure on the Shannon Navigation at Meelick Weir.

The funds will be used for the restoration and replacement of the Meelick Weir walkway, the installation of tilting weir boards and remedial works to the weir structure.

The minister was joined on site yesterday (Friday 1 March) by Éanna Rowe, regional manager with Waterways Ireland and by Ministers of State Seán Canney Ciarán Cannon, along with Anne Rabbitte TD and local community representatives.

Meelick Weir was originally built in the 1790s as part of the Shannon Navigation. The weir, which is over 300 metres in length with a 12-sluice barrage, maintains and regulates the navigation level for that section of waterway between Athlone (Lough Ree) and Meelick (Lough Derg).

The weir and its walkway link the historic village of Meelick in Co Galway to Lusmagh in Offaly, and also link into the Hymany Way walking trail. The weir was damaged during storms in 2009 and the walkway was closed following further storms in 2015 and 2016.

Speaking yesterday, Minister Kyne said: “I am fully aware of the importance of this restoration to the counties of Galway and Offaly and in particular to the local communities of Lusmagh and Meelick who have been without the walkway for a number of years now.”

He added: “Meelick Weir is not just a walkway but a hidden gem on the River Shannon and its restoration shows the Government’s commitment to supporting all aspects of rural Ireland`s economic development.”

Éanna Rowe of Waterways Ireland said: “The development and re-instatement is critical to the management of the navigation and regulation of water levels.

“Reopening the connectivity between the communities of Lusmagh and Meelick and the re-instatement of the link to the Hymanny is a hugely positive and significant development for both communities.”

Waterways Ireland initiated design work on the project in 2012, completed the statutory environmental assessment and submitted planning for the project to Galway and Offaly county councils, which was given in 2017.

The works will involve the restoration of the weir, its walkway and the tilting weir boards along with the other critical infrastructure requirements (replacement of lock gates, jetty replacement, embankment works and bridge strengthening).

The new tilting weir system is being touted as a significant improvement in health and safety for employees managing water levels on site.

Following an open tendering procedure, a contractor will be shortly appointed and the project will be completed mid-2020.

Published in Inland Waterways

A floating food market is one of a number of ideas being mooted for in Grand Canal Dock by Waterways Ireland, the Dublin InQuirer reports.

Such a scheme would include a waterfront dining area and a co-working space along with the “curated, carefully selected floating village market on canal barges”, as suggested in a feasibility study conducted late last year.

Local councillors also recently heard of plans to develop the triangle of land Waterways Ireland owns at South Dock Road and Grand Canal Street Upper, where the canal basin and the River Dodder meet the Liffey.

The lands currently house two Georgian era graving docks, one of which is where the former Aran Islands ferry Naomh Éanna is being restored as a luxury hotel.

However, concerns remain that Waterways Ireland’s plans could be detached from the wants and needs from the local community in Ringsend.

The Dublin InQuirer has much more on the story HERE.

Published in Inland Waterways

Waterways Ireland intends to dispose, by public tender, of a number of vessels removed from the Grand Canal at Shannon Harbour, Tullamore, Barrow Navigation, Killaloe Canal and Shannon Bridge.

Twelve vessels are presently stored on the South Bank of the Grand Canal adjacent to the Transit Shed in Shannon Harbour. One vessel is stored in Fenniscourt on the Barrow Navigation and other vessels are stored in Ballyleague and Munster Harbour, Portumna.

All vessels may be inspected (externally only) by local arrangement. Tender and relevant documentation is available from the Assistant Inspector of Navigation at +353 87 286 5726 or [email protected]. Alternatively you can download the tender documentation from the Waterways Ireland website.

Sealed tenders should reach the Assistant Inspector of Navigation at the above address not later than noon on Monday 18 March.

A condition of sale is that vessels be removed from the canal property once purchased. Removal details will be notified to successful purchasers once transactions are finalised.

Published in Inland Waterways
Page 1 of 17

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020